How can you be so sure the end hasn't already come and gone? I've seen some strange things lately....we could actually be in the twilight zone already. Can't you hear that strange music?
You mean this music?
YouTube - Golden earring - Twilight zone
We LOVE books and hope you'll join us in sharing your favorites and experiences along with your love of reading with our community. Registering for our site is free and easy, just CLICK HERE!
Already a member and forgot your password? Click here.
How can you be so sure the end hasn't already come and gone? I've seen some strange things lately....we could actually be in the twilight zone already. Can't you hear that strange music?
Europe's Large Hadron Collider was knocked offline today due to a faulty electrical cable, just a couple of days after the accelerator broke the world record for proton-smashing power. Electrical power was restored within hours, with no major effect on LHC operations, according to the CERN particle-physics center.
"Even as we speak, they are still trying to get beam back to the LHC," CERN spokeswoman Katie Yurkewicz told me just before 3 p.m. ET (9 p.m. Geneva time).
She said the bad cable tripped an 18-kilovolt circuit breaker that served part of CERN's power supply network. The good news is that the outage did not affect the part of the system that powers the LHC's supercooled magnet system. The bad news is that it brought down the main computer system at CERN's headquarters in Meyrin, just outside Geneva, as well as the equipment that injects beams of protons into the LHC's underground ring.
That meant many of CERN's Web sites became temporarily inaccessible, and LHC operations were halted. Even when power was restored and all the equipment was back up and running, the LHC's operators had to put the system through a checkout to make sure it was safe to resume shooting proton beams through the ring.
The outage was nowhere near as serious as the blowup that damaged the LHC's cooling system in September 2008, shortly after the collider was turned on. It took more than a year to repair that damage and upgrade the facility's safety system, building up to the LHC's restart late last month.
Today's electrical glitch, which came to light on the LHC Portal discussion forum, was more like a power cut that occurred a month ago. That outage was blamed on a bird that apparently dropped a soggy piece of bread onto a power substation. This one was traced to a break in cable insulation that caused a short circuit, Yurkewicz said.
She stressed that today's setback was nothing out of the ordinary, particularly during the shakedown phase for a facility designed for peak power consumption of 120 megawatts. "This is the sort of thing that happens at accelerators," Yurkewicz said.
Is this more to your liking?
Bad insulation on a wire caused a short and tripped a breaker. I can draw a picture if it will help.
Did the experiment work?
How do you know? (Show me with a simple picture).
It's nothing compared to what's going on in your brain though.
We're talking on different tracks; I should have been clearer. I meant I was snoring until they get their act together and finally say all the kinks are out and it is working.
Wake me up for the pictures.
/snoring by now/
It doesn't take a genius to ask the questions, or to understand the answers.
If the world is planning to end,I would appreciate it if it ends after March.:whistling:
What's in March that the world's end has to wait for?